Xiashilong Hydropower Station
Xiashilong Hydropower Station is the third stage hydropower station developed on the main stream of Xiangjiang River. The installed capacity of the power station is 50MW. It was connected to the grid on February 28, 2005 with a total investment of 500 million yuan.